Clarifications may be sought on this blog. The main features, in informal terms, are as follows:-
(1) The PEC will be in charge of an OC(PEC) who may or may not be the OC(Election) of the subdivision / sadar. He will especially oversee image merging operations through the technical hands and ensure that no images are lost.
(2) PEC/ camera / data entry / photo-scan staff will be engaged, if required, on a piece rate basis. No mandays will be allowed. For example, Re.0.50 p for every image captured on CD with image-elector linkage etc. For example, Re. x for data entry of each record consisting of Bengali and English versions.
(3) Use after-evening house-to-house visit or cluster of booths depending on circumstances. Objective: 100% EPIC coverage, 100% image coverage.
(4) Timelines:-
- 25.11.08 to 15.12.08 : Off-site EPIC Campaign. Images to be merged in PEC. Scanned images to be also merged in PEC.
- 20.12.08: All image back-up from all merged images in PECs to be sent to CEO in CDs before this date. Remember, 20.12.08 is a Saturday and we'll keep our office open to receive the CDs from each District.
- 15.12.08 to 26.1208: Data entry in both languages at subdivisions
- 29.12.08: Last date of receipt of data CDs at CEO office
- 5.1.09: Target for handing over .pdf CDs from Kolkata SLA to DEOs. (This date is not indicated in the GO. Note that .pdf CDs will be done centrally in Kolkata. So last date for sending data CD will not be extended)
- Printing of hard copies at districts from CDs obtained from Kolkata SLA.