I am told that the following districts:
Jalpaiguri
Darjeeling
Murshidabad
Pashim Midnapore
Purba Midnapore
Burdwan
North 24-Paraganas
South 24-Paraganas
Nadia
Hoogly
Birbhum, and
Bankua
have not sent data - partly or fully - on (1) Section Details (2) Polling Station Details and (3) List of Polling Premises. If so, please send these IMMEDIATELY. Matter urgent.
11 comments:
Sir
Total data of Murshidabad already submitted today at WTL as instructed.
Dipanjan
OC Election Murshidabad.
Sir,
The Control Table information is being sent today to the WTL for the district of Nadia.
Yours faithfully,
Indranil
O/C Election, Nadia
Sir,
Today we are sending Control Table information to WTL for corrction of top sheet information.Already we have sent data regarding distance of polling stasions from the mouzas.
Yoursfaithfully,
o.c-Election,Hooghly
Sir,
The report as desired had been handed over individually to the WTl team working in the District by the EROs wih due endorsement to your office. A second copy collectively was also taken by the representative of WTL three weeks ago.
Yours faithfully,
OK, Murshidabad, Nadia, Hoogly and ..?
Sir,
The required "Control Table" data has been handed over to WTL at their office at Salt Lake on 10/12/2007. Previousely the same was handed over to the agent of WTL working in the district during EPIC campaign in Sep, 2007.
Yours faithfully,
Asim, O.C.-Election, Jalpaiguri.
11/12/2007
OK, Jalpaiguri
Sir,
Vide your office memo no.351/JSSG/WBE/2007 dt 28/12/07 received on 03/1/08, it was learnt that software would be sent to the districts for rectifcation of the front pages, the multiple errors which were reported earlier, on 3/1/08.
The same has not reached the district till today i.e.4/12/08.
You may be informed that we had been given 07/1/08 as the last date for completion of data entry.
"OC ELection", please (always) identify your district.
The matter has been taken up with WTL.
Sir,
Sorry i missed out on the name of the district, Darjeeling
Sir, yoy may be informed that as per the communication of your office the correction of front pages was to scheduled from 3rd Jan to 7th Jan,2008. Till today i.e.08/01/08 we have not heard from the Wtl vendors.
In view of the fact that the time is short and the way/pace in which the WTL is functioning and We still have much work to do i.e. checking of checklist and printing of the supplements and front pages,there are chances that the deadlines would be difficult to reach.
Please be informed.
O/C Election, Darjeeling
i hope, Dj, the matter has since been resolved. If not, pl speak to me over telephone.
CEO